top of page

Projects
Graphic Packaging - 700kW
Flat-mounted 500wp panels comprising 700kW. Take a closer look from the on-ramp at Penrose.

Whangarei Drycleaners - 110kW
110kW using 380wp panels and two inverters connected to two ICPs

Te Rapa Stage 1
This is Stage 1 of a 404kW array at the Te Rapa site. Stage 2 involves moving to 1.2MW.

Maraki Farms
Dairy sheds have a natural seasonal fit with solar/ This is a 70kW array.

Danone Nutricia - 1,490kW
1,490kW using 12 x 110kW inverters and several panel sizes, connected to four ICPs

Solway College
A 108kW system on two hostels and two main buildings and one ICP. See the customer case study.

Typical distribution board
This shows how little space is needed.

bottom of page





